From: route@monster.com
Sent: Friday, April 29, 2016 3:31 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
ROGER TUKEI SUMMARY Design
Engineer offering eight plus years in the telecommunication industry with
increasing technical growth in the areas of AC/DC power plants, data
transmission and drafting. Expertise ranges from designing complete DC power
plants to the integration of transmission equipment into existing central
office (CO) plants; drafting from scratch Central Office/ Data Centers
building, Floor plan, Cable Racking plan, Grounding plan, HVAC and Fire
suppression plans. Designs recognized as superior as evidence by the
incorporation into central offices with companies such as AT&T wireless
and Verizon wireless. Network Support Design
Engineer (OSP): FiberLight, Alpharetta
Ga Aug-6-2012 To Present. Planning/Designing
(O.S.P) fiber lay for point to point to fully protected diverse rings.
Assigned to and supported the entire Texas market from proposed design to
construction and finally testing before handing off to customer for approval.
Designs have been incorporated by Alpheus, Verizon, XO communication,
CBeyond, ICTX, Time Warner, Cogent and many more large service provides.
Constantly met and exceeded customer expectation, through attention to
detail, communication and exceptional time management skills. Optimized
networks for maximum profitability while providing cost saving methods. AT&T; OSD (Operations
Support Desk); March-19-2012 – August-3-2012 Responsibilities include creating
and managing tickets to CBRE vendor, provide support to Network Field
Operations, reviews data base ticket issues, interfaces with various
departments within AT&T regarding created tickets. Opens, updates, and
closes tickets as required to track progress of mobility cell site trouble
resolution. Assists and supports Field Operations as well as MNRC and outside
vendors such as CBRE and maintain documentation of daily operations. Atlantic
Engineering Group, (Out Side Plant Designer/drafter) May-9-2011
To March-16-2012. Perform
base map updates/clean up using AutoCAD; Assist with the planning and design
of fiber layout form hub sites to customer location. Planning/Designing
(O.S.P) fiber lay out on a large municipal and city scale. Create the blue
prints layout for final construction upon completion of design. Designs have
been incorporated by Google fiber, Opelika AL, North Alabama Electric comp. Crest
Point Solution, Pleasanton, CA (Field Service Engineer) May-27-2005
To September-10-2010. Performed
site surveys nation wide for AC/DC (-48V) power or data transmission per
customer needs. Surveys and Design warranted in-depth understanding of DC
power, Rectifiers, Distribution Bays, Transformers, inverters, Bus Bar,
BDFB’s, Battery strings, PDC, PDF, PDU, UPS all the way up to the Equipment
Bays and how all are interconnected to create a DC power plant. Understanding
of how commercial AC is integrated into DC power plants from main AC panels
through ATS and MTS switching to Main Distribution Panels into rectifiers.
Understanding of Inverter plants conversion of DC to AC in the DC power
Plant. Using customer’s voltage drop requirements, calculated cable sizes
requirements for DC power plants from battery strings to Main Battery Term
bars or Bus bar. Wrote detailed engineering specifications package including
M.O.Ps according to customer ROGER
TUKEI Page 2 standards
or Telcordia GR-1275. Updated or created new office record drawing for new or
existing Central office buildings using Auto-cad. Performed FEV (Front
Equipment View) surveys for the purpose of equipment placement, heat
dissipation and cataloging equipment in network cabinets. Consistently met or
exceeded customer expectations with minimal direction and self-driven work
towards common goals within established project timeframes. Byers
Engineering, Atlanta, GA. (Drafter) June-5-
2004 To May-13-2005. Assigned
to the MTS project (Manitoba Telecommunication Services), my duties were to
draft out the telecommunication infrastructure Out Side Plant; of the city of
Manitoba (Canada).
Draft and document over head transmission and underground transmission of
copper and fiber optic cable layout including interconnecting
equipment. Best
Buy, Tucker, GA (Computer Tech / Technical sales) September-2003
To May-28- 2004 As
a member of the GEEK squad, I upgrade, troubleshoot and repair computers per
customer needs. Advised, recommended and answered technical questions related
to video, audio and soft ware. MARCONI
COMMUNICATION, Atlanta, GA (Design Engineer.) Febuary-1999
To June-2002; Engineered
and integrated telecommunication equipment into existing and new central
offices. Interfaced with Job Quoters, System Engineers, Resource Managers,
Equipment Manufacturers, Project Team Managers (PTM), installation crews and
the customers to ensure successful completion of the scope work. Performed
site surveys nation wide as required for the purpose of preparing quotations
and/or laying out project requirements for AT&T. Created and updated
office records, documentation for customers and Bill of Material (BOM) as
required for each project. Wrote detailed job specifications package
according to customer standards, N.E.C, GR-1275 and methods of procedures
(MOP) for scope of work for the customer. Oversaw multiple projects at any
given time; Projects include engineering, furnishing and Installation
(EF&I) of Power equipment such as Rectifier, AC-DC converter, Battery
Strings, Data Gathering Unit, BDFB, Supplemental Bay, DMACS and Alarm Node
for -48V Power Plant. Planned out high and low level framing to facilitate
cable racking in central offices. Febuary-1999
To June-2002 (Working both power and Data at the same time for Marconi) Integrated
various switches and network routing equipment for transmission according to
AT&T provided Project letter. Performed Site Survey which required
experience in Frame Rely, Switches, ATM, Routers and DSL Broadband, etc.
Media used for these projects are -48V DC Power, DSX3, DS1, fibers [OC3,
OC12, OC48, OC192] Collaborated with other engineers to generate unique ideas
in the execution of projects. LOWES
COMPANIES, INC., Nationwide (Technical /Project Manager) Febuary-1998
To January- 1999. Completely
oversaw and led selected projects involving planning, design, installation
and technical support of voice, data and video related activities for all
allocated LOWES locations. This required knowledge of ISDN, network
protocols, CSU/DSU, voice, copper (CAT -5&6) and fiber optics
(Single/Multimode) cabling plants, Patch Panel design and Token Ring design. EDUCATION |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|